Wednesday, October 21, 2015

Runway identification difficult production and construction complex only qualified

Runway identification difficult: production and construction complex, only qualified raw materials does not explain the problem

First kindergarten, Pujiang town, Minhang district, Shanghai Jade Garden plastic runway.

Recently, the Shanghai Songjiang, Minhang two nursery schools, appeared after the children go to school nosebleeds, dizziness, rash symptoms, plastic track parents who suspect the school may be "toxic."

In response to these circumstances, spokesman for the Shanghai Municipal Government on October 21 to respond: If there is a violation, Stern would not tolerate. Earlier, the Education Bureau of Shanghai Municipal Education Committee has asked the County to new plastic area school sites and other facilities related to student health and safety to conduct a comprehensive investigation to ensure that school facilities in line with national standards and the city of Shanghai.

Government attitudes is bright, but construction standards around campuses plastic ground, poison testing, supervision and other aspects of many questions still need to relevant departments as soon as possible to provide authoritative answers.

The Shanghai Municipal Government where there are illegal will not tolerate 

On October 16, the media Song Jiang Hua Ting kindergarten part II children nosebleeds, cough, skin rashes and other symptoms, parents who suspect and newly paved runway of the schools.

In addition, the first kindergarten, Pujiang town, Minhang district, Emerald Park of more than more than 60 children on September 1 after admission, also suffered different degrees of Allergy and inflammation, parents are suspected of "culprits" had just completed a plastic playground.

October 21 afternoon, for Shanghai two home kindergarten of plastic playground odor situation, Shanghai Municipal Government spokesman CCTV in municipal government press conference Shang said: "Shanghai City Board established has emergency working group, requirements related District Bureau joint built tube, and health, and environmental, sector composition survey group, and delegate has qualification of authority institutions, on related kindergarten of plastic site for full detection, timely to parents and social announced detection results, once found problem, must immediately rectification; if has illegal violations situation, To seriously investigate and will not tolerate. For new plastic site comprehensive investigation related to student health and safety facilities, ensure that facilities meet the standards of the State and this municipality. "

On October 21, the surging News (www.thepaper.CN), Songjiang district, reporters from the Bureau was informed that, on October 20, the Bureau received the bid submitted by the construction enterprise, Songjiang district, Shanghai long ancient building decoration engineering company about Hua Ting the second kindergarten plastic report on the modification of the site, construction enterprises "huating two young plastics site to be totally weeded out and eliminate the residue" and "eradication of regional implementation of concrete hardening" views of the reform.

In this regard, the Songjiang District Education Bureau decision: "engineering project bidding and construction conform to the opinion, plastic made by environmental protection departments ambient air quality on the site also qualified, plastic ground production in China and no national mandatory standards, but parents concerns and requirements, in line with health protection considerations, ensuring children in the Park, agreed to bid for construction enterprise to plastic sites for rectification. "

October 21, road, Minhang district, Bureau said, River town first kindergarten has active will Emerald points Park of children shunt to total Park attended, Minhang Bureau and River town Government will timely with environmental, professional sector for detection, and convened parents, and construction party, on plastic site finished site sampling Hou delegate has qualification of units detection, and will results timely to parents and social announced, as has problem, will first time timely strongly rectification. Minhang Education Bureau official said, whether removal will also be waiting for the test results before making a decision.

Contractor: District School Board have involved plastic site certificates

China online bidding announcement, Pujiang town, first kindergarten as the out-contracting units, construction sites as Jiang Mei Road No. 557 (Emerald Park), project for the ceiling of 250 square meters, plastic 980 square metres. Bid results: Shanghai Hao Ke construction and Development Limited (hereafter referred to as our headquarters company) for the contractor.

Surging when journalists interview Hao company official, the other side says no person report, their many projects in Shanghai, Jade Garden plastic playground is not necessarily their company project.

The afternoon of 21st, surging journalists came to the small wooden bridge road, xuhui district, lane 780, 5th floor of our headquarters company, one official said Wang, Emerald Park Playground as they contract. Commenced he insisted that all process compliance legal, "we are a medium sized project platform from the Minhang district, bid for the project, and then in the party, as well as selected raw material manufacturer, under the supervision of the Commissioner".

The owner said, chose the material provider, in addition to the relevant qualifications are to meet the requirements, and heard of the manufacturers in the industry have worked with several construction units and never had problems. "Before the construction, we look at the vendors provide a variety of certificates, product warranty, jade is our cooperation with the manufacturers for the first time in kindergarten, we cannot knowingly materials have also continued, but we do not have to detect environmental assessment and sampling inspection report now, have a problem, eradication. "

As regards the contractor mentioned raw materials manufacturers who, whether the vendor has related qualification certificates, the official said, "all District Education Bureau and supervision hold a copy of the certificate", specifically in charge of the project who is not, to say. Doctors transplanted lung rejection of late ticket

According to a test report according to the students ' parents, Taizhou city, plastic materials are all the sports facilities co., Ltd.

Send "special adhesive for plastic track" and "plastic particles" in the two samples, detected in adhesives containing methylene diphenyl diisocyanate (MDI), detection of plastic particles, organic and inorganic constituents are not up to standard. Previously, Songjiang kindergartens issued two raw materials provided by the contractor inspection report also shows the detected MDI, and organic and inorganic standard.

Is responsible for testing laboratories a staff, all testing in accordance with the national standard, but the standard is finished for the runway, "raw material is difficult to establish the standard for detection, such as glue, it has many uses, testing only for what it ultimately used in products which set standards".

Expert: raw materials, qualified does not mean that the problem was detected

Identified in the inspection of samples of MDI, plastic particles and organic and inorganic standard mean playground is "poison"?

The afternoon of October 21, East China University Research Professor Chen jianding runway material explains, for MDI adhesive detected, does not mean that the material is a problem, MDI itself is toxic, but it is must be added during the production process of one material, "to see the final compounds have HIV, can not be generalized."

Plastic particles and organic and inorganic, and Chen jianding said there are no plastics granule raw material standards, test reports issued by value is finished for the runway. Plastic particles from raw materials to the final product, has to go through many adds and synthesis in the Middle, the final product after all good, also depends on the process, "raw material inspection reports is to provide the contractor provides how to add references, does not prove anything."

According to the journalists about the surging, in a subsequent rectification, environmental protection departments in taking forward the air monitoring work to ensure that air quality in conformity with the relevant standards.

"However, in the process of testing, even if detected pollution situation in the kindergarten of the air quality could not unilaterally decided that it must be caused by plastic track, can only be guessed. For detection of plastic products, the Environmental Protection Department does not have the qualifications, it is not authoritative, it is often difficult to determine. Plastic product quality supervision departments should be examined. "Surging environmental industry one industry source told journalists.

No comments:

Post a Comment